My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1010 SE EVERETT MALL WAY BASE FILE 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1010
>
BASE FILE
>
1010 SE EVERETT MALL WAY BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 11:30:09 AM
Creation date
2/13/2017 7:00:31 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1010
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. i <br /> � <br /> � <br /> BARGHAU�EN CONS�LTING ENGIfdEER:S, IfdC. <br /> "Land Planning, Survey, and Design Specfalists" <br /> '�da� �,�iohl �i�qnd <br /> -:......�.l3ii.:.�'�:� =(1 �,.:I� <br /> ............. <br /> ..._,::..,�, <br /> b861 S� d3S <br /> September 21 , 1984 <br /> (�' � � G � a � � <br /> �EQ � � 1984 <br /> Mr. Eric Palmer <br /> Harmon b Associates <br /> 11000 Lake City Way N.E. <br /> Fourth Floor <br /> Seattle, Washington 98125 <br /> Re: Everett P�iall Offica Park/Additional Paving <br /> Our Job No. 110� <br /> Dear Mr. Palmer: <br /> In accordance v�tth yeur request, we have revlewed tha exfsting <br /> detent!on system which was approved by the City of Everett on Aug- <br /> ust 11, 1980 (per Trlad Assocfates� drawing, dated June 27, 1980, and stamped <br /> by Triad�s office on June 30, 1980, under their Job No. 79-390) . ? ,e det�ntior� <br /> system was desfgned and installed to accommodate additional future asphalt;ny <br /> at the Everett Mall Offfce Park. It is our optnion that the existtng <br /> parktng lot can be extended to ihe west and to the north, In accoruance <br /> wtth your current expanston plan, without maktng modifications to the retention <br /> system at thls potnt fn tfine. i+ should be recognized, however, that ln <br /> the event the balance of the propsrty ls covered with an impervious surface, <br /> additional detentfon wili be necessttated to compensate fur the reduction <br /> in the pond volume, resulffng from any encroachment fnto the present detentfon <br /> pond. Care should be exer�lsed to (nsure that Outfall No. 2-A ts not obstructed. <br /> If we can be of further assistance, do not hesitate to call . <br /> Sincerely, <br /> `V� <br /> H. Wayne Gi s, E. <br /> Engineering Man <br /> H4'G/Jds <br /> B-1109.01 <br /> 6625 South 190th, N102 • Kent, Washington 98032 • (206) 872-5522 <br />
The URL can be used to link to this page
Your browser does not support the video tag.