My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1010 SE EVERETT MALL WAY BASE FILE 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1010
>
BASE FILE
>
1010 SE EVERETT MALL WAY BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 11:30:09 AM
Creation date
2/13/2017 7:00:31 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1010
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � <br /> t <br /> ; <br /> � <br /> �r�t�ir.�.i:�ni�. n�<�'.�:�c�i: �. � i.�:v�i�:h� �..��v r�� i:ai <br /> . d V�ule..vn�i n�rvaa i:w�ara4wi . <br /> . ��D Wall Sveet Bmltlmp . Everutt,Wutihinpton 98201 1'ARNfON411AM:i ,1AMCSU IWIti5FlMAN � <br /> P.O. Dox 1077. Everect.W,�tihmg[uu 9f3206 IUWAROJ NbV�CN IIIIIMH GHAAFSIH4 � <br /> Area Cade 12061 Everutt 259-4741 inwai�un��aNsrN Wtll14MH SUILIVAN <br /> Seattle fi23-5738 11OUG14511 M4N511 70MC pICNGON <br /> OUIIGLAyF GNAHqM JEFiHEYE VR4�f � <br /> HUN41 O l.C4514tIkHRY <br /> September 29, 1980 <br /> Di rzCtoY <br /> Department ot Public Works <br /> C9ty of Everett <br /> City t3a11 <br /> Everett, Washington 98201 <br /> Re: Everel-t Mall/South Sroadway Name Change <br /> Dear Sir: <br /> On behalf of the Everett Mall Merchant's Asso- <br /> ciation and Roebling Management Company, managers of the <br /> Everett Mall, our law firm hereby submits a proposal to <br /> the City of Everett to renaine the street now known as <br /> South Broadway, "Everett Mall Way. " The desirability of <br /> such a proposal has been the periodic subject of discussion <br /> and correspondence between the proponents of the name change <br /> and the City over the past several years, but has not been <br /> formally acted upon. However, the continuing economic <br /> growth and activity in the Everett Mall area neceasitates <br /> immediate formalization and municipal consideration of the <br /> proposed name change. <br /> The proposal encompasses the total length of South <br /> eroadway between Evergreen Way and the stoplight immediately <br /> south of Highway 526, called the Daeing Freeway. The total <br /> affected distance is approximately two miles. <br /> The reasons and justi£ication for the name change <br /> and the benefits to be derived therefrom are perceived as <br /> numerous. The most significant effect of the proposed re- <br /> name would be to eliminate much oE the conEusion of non-local <br /> shoppers who desire to' visit the Everett Mall. Interstate 5 <br /> travelers �ould easily be directed to the mall area by new <br /> signs placed at the north and so�th freeway off-ramps. The � <br /> recent opening of the Alderwood Mall and its visibility from � <br /> the freeway increases the urgency of insuring maximum visi- <br /> bility � ' and accessibility to the Everett Mall from all <br /> heavily .:aveled routes. It should be noted that most other <br /> major malls in this geographical area are situate upon <br /> access routes which bear the mall name, i.e. , SouL•hcenter <br /> Parkway, Northgate Way, and Alderwood Mall Boulevard. <br /> , ' i <br /> _ _ - - <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.