My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1020 SE EVERETT MALL WAY CHEVRON 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1020
>
CHEVRON
>
1020 SE EVERETT MALL WAY CHEVRON 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2019 2:07:25 PM
Creation date
2/13/2017 7:05:59 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1020
Tenant Name
CHEVRON
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBL/C I�f/ORi�Ls � <br /> October 29, 1997 <br /> Robert Downing <br /> HC Design LLC <br /> 5707 Parkview Lane <br /> �verett, WA 98203 <br /> Subject: Owner: DPP Inc. <br /> Job Address: 1020 SE Everett Mall Way <br /> Plan Check No.: 56706 <br /> Dear Mr. Downing: <br /> In response to your application for a construction permit, your plans have been examined and you are <br /> advised that the issuance of a permit is being withheld for the reasons listed below. These comments <br /> address building issues only, additional revisions or additions may be required by other departments (such <br /> as Utilities, Planning or Fire). All references refer to the 1994 Uniform Building Code, as amended by the <br /> State of Washington and/or Washington State Energy Code 1995 Edition, unless stated otherwise. <br /> In order for the processing of your application to continue, it will be necessary to <br /> provide the Building Division with two copies of revisions reflecting necessary <br /> corrections. <br /> I. A one hour occupancy sepuation is required between the store and both new canopies (UBC <br /> 302.1 and 311.2.3.2). In the past, the City has allowed the use of automatic sprinkling of the <br /> exterior walls as mitigation ro the above requirement. <br /> 2. Please provide a detail to show permanent access to the roof. <br /> 3. Please add the tempered glass requirement to all full height windows to provide compliance <br /> with UBC 2406.4.7. <br /> Upon resubmittal of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information ro ensure tha[ [he <br /> proposed strucmre ill be constructed in compliance with all adopted codes. <br /> Si�uerely, � � �{,.� <br /> v � � <br /> i <br /> Steve Miller, PE <br /> Associate Engineer <br /> ssCµaqa�.:p�:�ni <br /> CITY OF EVERETT• 3200 Cedar Street • Ever2tt. WA 98207 • (425) 257-88G0 • Fax (425) 257-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.