My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1020 SE EVERETT MALL WAY CHEVRON 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1020
>
CHEVRON
>
1020 SE EVERETT MALL WAY CHEVRON 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2019 2:07:25 PM
Creation date
2/13/2017 7:05:59 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1020
Tenant Name
CHEVRON
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> i TRANSPORTATION PLANNING & ENGINEERING, INC. <br /> 71111 I 1:'lli AV(II!II 11�� 'illlll I III ❑f 1 l I Vllf.1YA::IIIIIIiIUN IIppO�� <br /> '� ifLGPFIONF (•1?bl afi5 S3'n <br /> � , ri��nn ue..n, ri r,�..�e�.�n <br /> � „ <br /> I �nvinuii�n�nri m�..ri..:.�i�...� FALSIA9lf_I�1.^51�5] ]IBP <br /> November 24, 1997 <br /> �� <br /> Mr. Lee White � �,� <br /> DPP INCORPORATED ��e � <br /> 9333 N.E. 120th St., Suite 201 <br /> Kirkland, WA 98034 <br /> Re: Evereit A4all Way Chevron/Convenience Market <br /> Trip Generation and Site Circulation Letter A ^ � <br /> I �/I/I <br /> Dear Mr. White: �� G <br /> Per your request we have prepared this trip generation ar.tl site circula ' etter <br /> for the proposed Everett Mall Way Chevron/Convenience Marke; project. It is our <br /> understanding that the project consists of a five pump (10 fueling positions) gas <br /> station with a 3,938 sq. fl. convenience market. The convenience market will provide <br /> a drive- up expresso window. The project v ill replace an existing bank building with <br /> � four drive up windows. The bank building includes two small businesses. The <br /> location of the project is off of Everett Mall Way S. E. in the City of Evereit, <br /> iWashington. Access to the project is proposed via two existing full access driveways <br /> , anto Everett Mall Way Southeast. <br /> i We have visited the project site 3nd prepared this analysis in accordance with <br /> � our telephone conversation with Wayne Wentz, P.:., of the City of Everett. <br /> IExisting Site Conditions <br /> The project site is developed with a 4,054 sq. it. building. This builuing <br /> I provides space for a 2,456 sq. ft. bank with four drive up windows and 1,598 sq. ft. of <br /> space for small commercial business activities. Access to the site is provided by two <br /> driveways onto Everett Mall Way Southeast. <br /> Trip Generation <br /> I A vehicle trip is defined as a single or one direction vehicle movement with <br /> either the origin or destination (exiting or entering) inside the study site. These trip <br /> generation values account for ail site trips made by all vehicles for all purposes, <br /> including commuter, visitor, recreation, and service and delivery vehicle trips. <br /> i � E053697.Rpf <br />
The URL can be used to link to this page
Your browser does not support the video tag.