My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
111 SE EVERETT MALL WAY BASE FILE 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
111
>
BASE FILE
>
111 SE EVERETT MALL WAY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2019 10:50:07 AM
Creation date
2/13/2017 7:11:56 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
111
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. .. - n_`�;45-,�=s��. � � . . <br /> ��� <br /> T"�t <br /> ��� br",. . <br /> F F.�+Y� <br /> � f { �u ' <br /> ������}'�(Sf n'- . <br /> 4� A�� ��W <br /> . ) r 1: ��5�"-'�'+��4tG <br /> . .. . _ . . } .. .. :. . <br /> �� '` Marvin C. HagZund, Director of Systems Dev�lopment RECEIV�p <br /> �,:�,�_ <br /> FROM Clair Olivers, Associate �ngineer �yt rcc,v;c,n;c..;c <br /> OATE May 8� LJ 1 J <br /> �' <br /> sue�ECT SIGN FOICAIQnC.� FOR OFFOICE BUIOLDING cirr oF eveaeTr. cv��t. wns�iHcirp� - <br /> lif <br /> AT 8. BROADWAY & INTERCITY (#97) <br /> WATER: <br /> There is a 12" C. I, main on the South side of S. Broadway and an 8" C.I. main on <br /> , the West side of Intercity. There is a static pressure of about 84 psi at the hydrunt <br /> at 2nd and Intercity, about 500' North ef the site, which is the nearest hydrar+. There <br /> is an existing n'-" service to the site from the main on Intercity which will have to be <br /> abandoned. <br /> SEWER: <br /> There is an 8" main on Intercity and a 12" main on the North side of S. Broadway, <br /> increasing to 36" near the i,asi end of the site. <br /> DRAINAGE: <br /> Thie site draine to North Creek, a salmon stream, the main stem of which crosses <br /> the aite near its iast property line. The Eastern half of the site is a critical drair_- <br /> age area, currently providing some natural detention storage. Developmen� of this <br /> portion of the site will require a detailed plan for any pro?osed grading and t'illing <br /> which sliould address the impact on downstream areas due to the los's of existing <br /> natural detention. A plan for erosion control during and after conatruction will have <br /> to be approved prior to commencing site pre:paration work. On-site d�etention with <br /> provision for sediment removal and use of a DOE-approved oil-separator will be <br /> required. <br /> cc: Celia Stron � <br /> Herb Bous ey �L'�-i�� <br /> � � <br /> / �c� j a� <br /> 1 <br /> k <br /> - . ,,.,�.rs.aa.—..-__..... . ._'^.....�..,...�.�sr_,. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.