Laserfiche WebLink
a . . <br /> I3ID TABULATION <br /> South Precinct Parking Improvements <br /> Dale 10/21/02 <br /> repnrcr ��: nm oor <br /> For: Fnci/ilies ENGINEER'S ESTIMATE <br /> Dn1c 10/2 UO2 <br /> ITGM UNI'f TO7'AL <br /> !� ITLAi Df:SCRIP7lON UNIT UAN7'ITY PRICG AMOUNT <br /> I Mobilization LS I 54,000.00 S4,000.00 <br /> 2 Sun�cyin6 LS 1 52,000.00 $2,000.00 <br /> 3 Construction Signs LS 1 5300.00 $300.00 <br /> 4 Alaintcnancc&Protection of Tra(iic Conirol LS I $400.00 5400.00 <br /> 5 Sa�ving Pavcmcnt L.P 700 $3.00 $2,100.00 <br /> G Remove Existing Pavement Typc I, SY 78 520.00 $I,SG0.00 <br /> Class 6 <br /> 7 Removc Cement Concrete Sidcwalk SY 21 I 51 I.00 $2,321.00 <br /> 8 Trimming and Clean Up LS I $500.00 5500.00 <br /> 9 Crushed Surfacing Top Coursc TON 90 $25.00 $2,250.00 <br /> i <br /> � <br /> 10 Asphalt Concrctc Pavement Class[3 TON 70 $G0.00 54,200.00 I <br /> �I Rclocatc Stairs LS ] 53,000.00 31,500.00 � <br /> 12 CcmcntConcreteCurb LP 840 $16.00 513,440.00 <br /> Typc G-2 <br /> 13 Cement Concretc Sidewalk Sl' �0 $40.00 $400.00 <br /> 14 Conduit Inslallation LS I $8,000.00 58,000.00 <br /> IS PaintSiripe LF 550 SI.25 5G87.50 <br /> � <br /> IG ModularBlockWall SP 720 $I5.00 $I0,800.00 � <br /> I <br /> 17 Road�vay Excava�ion Incl.Haul CY 232 $12.00 $2,784,00 y <br /> � <br /> CONTRACT TOTALS: $57,242.50 j <br /> � <br /> i <br /> I <br /> i <br /> � <br /> � <br /> ! <br /> �/ 1 <br /> � <br />