My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1121 SE EVERETT MALL WAY EVERETT POLICE DEPT SOUTH PRECINCT 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1121
>
EVERETT POLICE DEPT SOUTH PRECINCT
>
1121 SE EVERETT MALL WAY EVERETT POLICE DEPT SOUTH PRECINCT 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2019 12:14:14 PM
Creation date
2/13/2017 7:15:59 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1121
Tenant Name
EVERETT POLICE DEPT SOUTH PRECINCT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Repair and refinish disturbed finisli materials and olher surfaces to match <br /> adjacent undisWrbed surfaces. Install new fireproofing where existing <br /> firestopping has been disturbed. Repair and refinish materials and other <br /> surfaces by skilled mechanics of trades involved. <br /> C. Care should bc exercised in the cutting of conduits. If existing conduit is <br /> damaged bcyond reasonablc repaire, replace �vith ne conduit. <br /> 3.13 - FIELD QUALITY CON1'ROL <br /> A. Inspect installed componcnts for damagc and faulty work, induding the <br /> following: <br /> 1. Raceways. <br /> 2. Building wire and conncctors. <br /> 3. Supporting dcvices for electrical components. <br /> 4. Elcctrical identification. <br /> 5. Electrical demolition. <br /> G. Cutting and palching for cicctrical construction. <br /> 7. Touchup painting. <br /> 3.14 - RErINISHING AND 1'OUCHllP PAINTWG <br /> A. kcfinish and touch up paint. <br /> 1. Clean damaged and disturbed areas and apply primer, intermediate, <br /> and 6nish coats to suit the degree of damage at each location. <br /> 2. Follo:v paint manufacturcr's written instructions for surfacc <br /> preparation and fbr timing aud application of successive coals. <br /> 3. Repair damage to galvanized (inishes with zinc-rich paint <br /> recommended by manufacturer. <br /> 4. Repair damage to PVC or paint finishes with matching touchup <br /> caating recommended by manuCacturer. <br /> 3.15 - CLEANING AND PROTECTION <br /> A. On completion of installation, including outlets, fittings, and devices, inspect <br /> exposed finish. Remove burrs, dirt, paint spots, and construction debris. <br /> B. Protect equipment and installations and maintain conditions to cnsure that <br /> coatings, finishes, and cabinets are ���ithout damagc ar detcrioration at time of <br /> Substantial Complction. <br /> ��. <br />
The URL can be used to link to this page
Your browser does not support the video tag.