Laserfiche WebLink
everett INSPECTION REPORT <br />e( Address /,GCS Ip F-VorO t/ lY-c,ll LrIA l <br />Contractor /9- (oA_)41 "4 c: In <br />Owner /V iI /V 7"*/p <br />Date <br />TYPE OF INSPECTION REQUESTED <br />/<BLDG: Pmt. No. j 1 ❑ MECH: Pmt. No. _ <br />❑ ELEC: Pmt. No. ❑ PLBG: Pmt. No. _ <br />❑ Temp. Elect. <br />Lg Framing ❑ Gas Piping <br />❑ Footing <br />Ri Drywall, Nailing 'l Consultation <br />❑ Foundation <br />❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork <br />❑ Grid ❑ Struct. Slab <br />❑ Wood Stove <br />❑ Rough -In ❑ Final <br />❑ Masonry <br />❑ Service ❑ <br />VAPPROVALa, u-tom, • ❑ PARTIAL APPROVAL <br />❑ VIOLATION <br />❑ CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />❑ CALL 259-8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TOO ro6:::UPANCY. <br />A 2h,AS c T <br />Inspector <br />Date 3-/b- S <br />