Laserfiche WebLink
Charter Construction, Inc. <br />CHARTER 980 South Harney St. <br />c oesi■uc TiM Seattle, WA 98108 <br />Phone: (206) 382-1900 <br />Pax: (206) 382-0450 <br />CONTINUED - Attic sPACE <br />DESCRIPTION QNTY <br />All plumbing lines in the attic were severly fire damaged and will need to be redone. <br />Water heater - 20 gallon - Electric 1.00 EA <br />Water heater seismic strap kit - up to 55 gallon 1.00 EA <br />Thermal expansion tank - 2 gallon 1.00 EA <br />Dry ice blasting - Heavy 1.00 EA <br />Painter - per hour 2.00 HR <br />Labor to seal penetratrions between the CMU to encapsulate any gaps were smoke may have penetrated. <br />NOTES: <br />Unit D <br />Unit D <br />DESCRIPTION <br />QNTY <br />GENERAL CONDITIONS: <br />Content Manipulation (Bid Item) <br />1.00 EA <br />Post Construction Cleaning <br />1.00 EA <br />Price per unit from Superior Cleaning, includes all walls, floors, fixtures, blinds, windows, etc. <br />HVAC bid to replace all damaged items and detach remaining items for repairs. <br />1.00 EA <br />Electrical (Bid Item) - Restore to original condition <br />1.00 EA <br />Plumber - per hour <br />4.00 HR <br />Labor to disconnect and reconnect plumbing lines that run through the trusses that need to be replaced. <br />Acoustical Treatments (Bid Item) - Replacement of grid & tiles <br />1.00 EA <br />NOTES: <br />EVERETT-MALL: PLAZA 9/6/2011 Page: 15 <br />