Laserfiche WebLink
BARGHAUScN CONSULTING ENGINEERS, INC. <br />"Land Planning, Survey, and Design Specialists" <br />Play 28, 1986 <br />Mr. Gordon Witcher <br />City of Everett <br />Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />RE: Everett Mall Plaza Building No. 1 Grading and Storm Drainage Plan <br />Our Job No. 1198 <br />Dear Gordon: <br />I am forwarding four bluellne prints of the grading and storm <br />drainage plan for the above -referenced project for your review and approval. <br />This plan shows the grading and storm drainage systom for the revised <br />location of Building No. 1 within the Everett Mall Plaza - Phase II develop- <br />ment, which was already approved by your office on May 21, 1985. 1 am <br />submitting a set of these original approved bluellne plans to assist you in <br />your review of the revised Building No. i plan. <br />After you have reviewed the enclosed plans, please contact me at <br />this office to discuss any questions or concerns which you may have at that <br />time. <br />Sincerely, <br />x. gam <br />Daniel K. Balmelli <br />Design Engineer <br />DKB/vsh <br />c171.60 <br />enc: As Noted <br />cc: Mr. Ronald D. Gregory, Harmon and Associates <br />Mr. Jim Hately, James E. Bakke, Inc. <br />Mr. Al Padgett, DGH General Contractors, Inc. <br />9498 S.W. Barbur Blvd., #304 • Portland, Oregon 97219 • (503) 246.7157 <br />Home Office: 6625 South 190th, #102 0 Kent, Washington 98032 • (206) 872-5522 <br />