Laserfiche WebLink
INSPECTION REPORT <br />' Date: Permit: <br />r ' <br />Contractor:�n�1e <br />fit Owner:�� <br />Site Add <br />TYPE OF INSPECTION REQUESTED <br />ELECTRICAL BUILDING MECHANICAL PLUMBING <br />❑ Temp Service ❑ UFER ground ❑ Groundwork/Slab ❑ Ground%vJrk/Slab <br />❑ Groundwork ❑ Footing ❑ Rough In ❑ Rough In <br />❑ Slab/Conduit ❑ Foundation ❑ Ceiling Grid ❑ Ceiling Grid <br />❑ Rough In ❑ Structural Slab ❑ OK to insulate ❑ OK to insulate <br />❑ Service ❑ Framing ❑ Rooftop Units ❑ Water Service <br />i ❑ Grounding ❑ Insulation ❑ Mechanical Final ❑ Medical Gas <br />❑ Ceiling Grid ❑ Drywall Nailing 1�4 Plumbing Final <br />[]Electrical Final ❑ Shear Nailing GAS PIPE <br />SITE WORK ❑ Roof Nailing ❑ Rough In/Service Hot Water Tank <br />❑ Footing drains ❑ Ceiling Grid ❑ Refrigeration ❑ Rough In <br />❑ Roof drains ❑ Building Final ❑ Gas Pipe Final ❑ HWT Final <br />OTHER OR CONSULTATION: <br />❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br />�.J <br />❑ OK FOR C.O. El VIOLATION �, <br />❑ UNABLE TO PERFORM INSPECTION: <br />r-1 CALL f4251 257.8881 FOR REINSPECTION .24 hour notice required <br />� �i��•��.��� Inspector: �— Date:�� <br />EIR(4109) >C rLjx-.n rsu....... <br />