My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1305 SE EVERETT MALL WAY JOSE PEPPERS RESTAURANT 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1305
>
JOSE PEPPERS RESTAURANT
>
1305 SE EVERETT MALL WAY JOSE PEPPERS RESTAURANT 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2019 8:59:05 AM
Creation date
2/13/2017 7:37:01 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1305
Tenant Name
JOSE PEPPERS RESTAURANT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� H I P.�� ,.,��Ty o� c�ER=-- <br />�'°� "�:,� COMMUNI? -�OUSING L'v1PR0 ✓cME�'T PRC �T„q � . <br />uvi^.� V l r ^ ^. <br />i� iG,�"IV � . <br />Phone 29�.c-;<. � .�.,... _ -- _ = = r'':`'_ _- _ -_ <br />� � . <br />November 12, 198o F �� �� �`�" - <br />Coi.u.- 0�" <br />��� � °°�'� � <br />To All CHIP Contractors: <br />� � <br />Due in parl to the increasing size and complexity of recent <br />CHIP jobs and in part to certain lapses in obtaining Building <br />Permits in a timely mann�r, procedures pertaining to CHIP and <br />tk�e Everett Building DeparCment ha�e been changed. These <br />changes will affect CHIP Contractors in the following ways: <br />1. Some joCs will req�ire Plan Review Checks and Fees prior <br />to issuance of a Building Permit. We will be previewiny <br />the specs on all. future CHIP work with the Building <br />Department for them to make that determination. This <br />will be indicated on the bid package. If required, the <br />plan check should not significantly delay issuance of <br />the Building Permit but wil.� require payment of the <br />sta^dard P�an Check Fee and should be included in your <br />bid, Tables for these f:e:: are available at the <br />Buildina Aepartment. <br />Z. Building Permit must be obtained and posted, as <br />required, on the job site prior to issuance of any funds <br />for payment on any CHIP work. <br />Also note that we have changed the way we write the carpet and <br />vinyl spec. We have fuund that tying the quality to a retail <br />material allowance does not encourage competitive biddin3 when <br />there is often little consistency in the retail price from one <br />supplier lo another. Instead, we wil? usually have the owner <br />pre-select a specific brend, style and color which will be <br />included in the specs. <br />Siqcerely, <br />� <br />� ..ti� � .t >�—� <br />Vic Chapman � <br />Housing Improvement <br />< �' v _ <br />Steve G�ale� <br />Housing Improvement <br />J <br />Inspector <br />Advisor <br />
The URL can be used to link to this page
Your browser does not support the video tag.