My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1321 SE EVERETT MALL WAY OLIVE GARDEN 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1321
>
OLIVE GARDEN
>
1321 SE EVERETT MALL WAY OLIVE GARDEN 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2019 10:41:09 AM
Creation date
2/13/2017 7:39:22 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1321
Tenant Name
OLIVE GARDEN
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ESTIMATE SHEET <br />Receipt ,� <br />Cost of Work order <br />PUBLIC WOP.KS DEPARTMENT <br />UTILITIES DIV,ISION <br />2:1J0 CEDAR STREET <br />EVERETT, WASHINGTON 95201 <br />(206) 259-8800 <br />Date Paid / aa-9i <br />���6 Work Order # _ `/ fG 3 <br />r 6" Cost of Service Order '$Yt-6II0 G o— Service Order # <br />� 2 �! G�— <br />S- ��tT <br />Contact Parson: <br />Telephone # <br />Requested By: Kirk Brooks Date of Request 12-1U-90 <br />Property Owner (name) Olive Garden General Mills Restaurant Snc <br />Charge Cost tn (name if different than owner) <br />Address 6770 Lake Ellenor Dr. City Orlando. FL Zip 32809 <br />Installation Location 1321 SE Everett Mall Wav <br />Installation type/description/size/etc. <br />main. lav 'IRO� + nr — nf cn � ,..�ti, <br />service and restore area. <br />¢ <br />m <br />n <br />(x] The following estimate is based upon the Utilities I�ivision <br />providing all labor, equipment, materials, restoration, and firial <br />hook-up. <br />[] The following estimate is based upon the Street Livision werk group <br />providing all labor, equipment, materials and restoration 1:0 <br />property. <br />Whenever the estimatr.3 cost ia not sufficient to cover the total expense for labox•, <br />mat:erial, em�ipment rental and administrative costs, the deficit shall be charged to <br />the property for which such ir.atallation was made and the owner thereof, and provided <br />further, ;:hat any excess payment ehall be returned to the person applying for the <br />installation. <br />Itemized Cost Estimate: <br />Labor & Overhead 4.200 �; <br />�,3 p-9 /� <br />Material 6.070 � <br />Equipment Rental 930 . C cf�'"c Mp�`/j <br />/_ iJ <br />�Gd <br />Surface Restoration 400 Wo"p�,,. ��� <br />2" Service Fixed Price 1 200 <br />Total �' <br />.�z-voo^ �Q0�7 � <br />Pre ared b // /`% / R� <br />P Y �',�'"•-,��. / � � �.���I <br />2e 6 6 <br />Accepted by Representing_ <br />cheryl Fontaine <br />Clair Olivers <br />Tom Thetford <br />Don Weitkamp <br />Kirk Brooks <br />Gordon Witcher <br />O. Don Wahl <br />Dan Lowell <br />Stan Mitchel.L <br />S � s <br />
The URL can be used to link to this page
Your browser does not support the video tag.