Laserfiche WebLink
everett INSPECTION REPORT <br />eAddress lyna <br />Contractor <br />Owner _ �' t7 QM 04 <br />Date <br />TYPE OF INSPECTION REQUESTED <br />❑ BLDG: Pmt. No. ❑ MECH: Pmt. No. <br />❑ ELEC: Pmt. No. Y PLBG: Pmt. No. 4 <br />❑ Temp. Elect. ❑ Framing ❑ Gas Piping <br />❑ Footing ❑ Drywall, Nailing 4Consultation <br />❑ Foundation ❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork ❑ Grid ❑ Struct. Slab <br />❑ Wood Stove ❑ Rough -In O Final <br />❑ Masonry El Service <br />❑ APPROVAL <br />El PARTIAL APPROVAL <br />❑ VIOLATION El REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />❑ CALL 259-8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />&L. P D, 04 , l 0c <br />