Laserfiche WebLink
RtPm <br />CIE M <br />H O N <br />{ 1am w I <br />low <br />Date (y 7f90 <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />City sweets <br />Describe Proposed Work <br />Tn02 sta Everett Nall Way - #9C <br />t <br />Publld Works Permit* .�—�— <br />eidg. Dept 490/24840 <br />Public Works Fee It —� <br />Total Fee <br />Less APPI Fee Paid $ ��- <br />Project Address fit known) <br />Attach four (4) copies of plans for proposed work • Draw to scale and note the Centerlinefollowing <br />of as applicable; <br />• Property Lines • Indicate North <br />• Outline and dimensions of all existing and 0 Show any proposed grading changes <br />proposed structures on the lot a Show measurements <br />• Existing and proposed utilities <br />.,.. unT IMPITF RFLOW THIS LINE <br />Phone <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 a ' it advance • phone 259.88 <br />2. All work shall be performed In accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />5. <br />3. Call Location Underground Service 48 hrs. (:efore you dig. TOLL FREE NUMBER 1.800.424.555 <br />�'saw,;I. <br />Date <br />Approved for Construction <br />Dale <br />FINAL INSPECTION <br />Approved as Constructed <br />W <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett WA 98201 <br />Phone: 259.8810 <br />cP <br />PO <br />FM <br />Cl) <br />0 <br />M <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied <br />dfor and <br />further <br />agrees eto rdemolie same upon amaged hereby. notice from the <br />City <br />repl <br />ce <br />Date <br />Signature of Applicant <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />IT MAY BE <br />THS PERM <br />CANCEL EDT LY BY THE CITY UPONPURSUED TOOANY STOPPAGEIOFWORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />