Laserfiche WebLink
INSPECTION REPORT <br />ETT <br />Date I-13-1 () Permit: E� I US — � 1 1 <br />Contractor: <br />1 j� T <br />Owner: Sli ad a511 EV I I p 41I <br />II,, <br />SiteAddress:_ H02- <br />/ <br />SE _Ul'r eff_Ma�l_ w -- <br />'rVPE OF INSPECTION REQUESTED <br />ELECTRICAL <br />❑Temp Service <br />❑ Groundwork <br />❑ Slab/Conduit <br />❑ Rough In <br />❑ Service <br />❑ Grounding <br />❑Ceiling Grid <br />Electrical Final <br />SITE WORK <br />❑ Footing drains <br />❑ Root drains <br />BUILDING !.:-HANICAL PLUMBING <br />❑UF'ER ground ❑GroundworklSlab ❑ Groundwork/Stab <br />❑ Footing ❑ Rough In ❑ Rough In <br />❑ Foundation ❑ Ceiling Grid ❑ Ceiling Grid <br />❑ Structural Slab ❑ OK to insulate ❑ OK to insulate <br />[ j Framing ❑ Rooftop Units ❑ Water Service <br />❑ Insulation ❑ Mechanical Final ❑ Medical Gas <br />❑Drywall Nailing [—]Plumbing Final <br />❑ Shear Nailing GAS PIPE <br />❑ Roof Nailing ❑ Rough INService Hot Water lank <br />❑ Ceiling Grid ❑ Refrigeration ❑ Rough in <br />❑ Building Final❑ HWT Final <br />❑�QGas Pipe Final <br />a � <br />OTHER OR CONSULTATION: _�_.1.. ✓_I.1 v V 1 v �" ------ <br />APPP.OVAL ❑ PARTIAL APPnOVAL FINAL APPROVAL THIS PERMIT <br />❑ FOR T.C.O. ❑ CORRECTION REQUESTED <br />❑ OK FOR C.O. ❑ VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION:---- <br />❑ CALL (425) 257.8881 FOR F.EINSPECTION — 24 hour notice required <br />Inspector: <br />rm nu om <br />Dal,: <br />onrnenn, wo <br />