Laserfiche WebLink
everett INSPECTION REPORT <br />Address <br />�— Contractor T <br />Owner <br />Date <br />TYPE OF INSPECTION REQUESTED <br />❑ BLDG: Prnt. No. _❑ MECH: Pmt. No. <br />NELEC: Pmt. No. 9�3, _❑ PLBG: Pmt. No. <br />/❑\Temp. Elect. ❑ Framing ❑ Gas Rping <br />❑ Footing ❑ Drywall, Nailing ❑ Coneultation <br />❑ Foundation ❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork ❑ Grid ❑ Strurt. Slab <br />❑ Wood Stove ❑Rough -In X Final <br />❑ Masonry ❑ Service ❑ <br />❑ APPROVAL [PPARTIAL APPROVAL <br />❑ VIOLATION ❑ CORRECTION REQUIRED <br />t - i7 Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />❑ CALL 259.8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector _. 6f< ._Date 1 <br />