Laserfiche WebLink
everett INSPECTION REPORT <br />eAddress Q�JEV"PI �a <br />Contractor <br />Owner_�T/�'/fPPyl <br />RF,wNfN S��r% <br />Date % <br />R <br />TYPE OF INSPECTION REQUESTED <br />ABLDG: Pmt. <br />No. Z41 ❑ MECH: <br />Pmt. No. <br />❑ ELEC: Pmt. <br />No. PLBG: <br />Pmt. No. <br />❑ Temp. Elect. <br />❑Framing <br />❑Gas Piping <br />❑ Footing <br />Drywall, Nailing <br />❑Consultation <br />❑ Foundation <br />Shear ding <br />❑Groundwork <br />r <br />❑ Struct. Slab <br />Stove <br />❑ Rough•In <br />❑ Final <br />Onork <br />y <br />❑Service <br />17 <br />IAP ROYAL ❑ PARTIAL APPROVAL <br />JDMOLATION ❑ CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />❑ CALL 259.8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector <br />