Laserfiche WebLink
everett INSPECTION REPORT <br />Address `� %/r <br />quContractor <br />/ <br />Owner — <br />Date <br />TYPE REQUESTED <br />.��,// <br />KIILDG: Pmt. <br />,OF. �INSPECTION <br />No. �W ❑ MECH: Pml. <br />No. <br />rr❑ ELEC: Pmt. <br />No. ❑ PLBG: Pmt. <br />No. <br />❑ Temp. Elect. <br /><oFraming <br />❑ Gas Piping <br />❑ Footing <br />''O Drywall, Nailing <br />❑ Consultation <br />❑ Foundation <br />❑ Shear Nailing <br />❑ Groundwork <br />❑ Ductwork <br />❑ Grid <br />❑ Struct. Slab <br />❑ Wood Stove <br />❑ Rough -In <br />❑ Final <br />El Masonry <br />❑ Service <br />❑ <br />�ETAPPROVAL 11 PARTIAL APPROVAL <br />❑ VIOLATION ❑ CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />❑ CALL 259.8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />�/ Z7-_���/-�� <br />Inspector — d Date ,G�/ <br />L <br />