Laserfiche WebLink
everett INSPECTION REPORT <br />,, <br />Address YOQ_ Sc=Gft`iZ�L�C./ <br />Contractor n4�i6�L� <br />Owner �� �S <br />Date <br />TYPE OF INSPECTION REQUESTED <br />��,❑BLDG: Pmt. No. ❑ MECH: Pmt. No. <br />j2SEELEC: Pmt. No. aV113 G PLBG: Pmt. No. <br />�❑ `Temp. Elect. ❑ Framing ❑ Gas Piping <br />O Footing ❑ Drywall, Nailing ❑ Consultation <br />❑ Foundation ❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork ❑ Grid ❑ Struct. Slab <br />❑ Wood Stove ❑ Rough -In coal <br />❑ Masonry ❑ Service <br />C7 APPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION ❑ CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />not able to perform inspection. <br />WeCALL 259.8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector !'" Date <br />