Laserfiche WebLink
'_Jt V�as^'3:cn <_b:e tb'snm:ro!.al <br />ProjectInio <br />Project Description <br />Briefly descrihe mechanical <br />system type and feaWres. <br />❑ Indudes Plans <br />Compliance Opiion <br />2001 Washi�^}on State Nonresidential <br />Fcrms <br />Name: <br />Code <br />KastorCuts (Space 2i5) p Evera:t Hall <br />3302 SE Everatt Nall Ha) <br />EvezatC, HF <br />AeGis Cotp. <br />7201 Netro Blvd, ldvna, N_v SSC39 <br />952-96"/-7]7"! <br />Juoe "'"' ",�c � <br />Date 11/3/2005 <br />New HVAC Unit w/all new distribution. New toilet exhaust. <br />Inciude documentation requiring compiiance with commissioning requirements, Section 7416. <br />� Simple System � Complez System � Systems Analysis <br />(See Decision Flowchart (over) for qualitcatinns. Use separate MECH-SUM for simple 8 complex sy,rem=.; <br />Gquipment Schedules The following information is required to �e incorporated with Ihe mechanical equipment schedules on the <br />plans. For projeds without plans, fill in the required inPormation belo�v. <br />Heatin E uipment Schedule <br />Equip. Capacity= OSA cfm <br />ID Brand Name' Model No.' BW/h Total CFM or Econo? Input P.tuh Output BWh Effcienc � <br />RrU-1 Carrier 5o�v�o06 57930 2100 310 72000.00 59040.00 Aooe <br />Fan L ui ment Schedule <br />Equip. <br />ID Brand Name' Model No.' CFM SP' HP/BHP Flow Control° Location of Service <br />Ee-1 Penn 2epnyr ZSH 100 .25" 0.06 �S SOIL£? AOC.N <br />'If available. ' As tested according to Tabie 74-1A through 14-iG. ' If reqwred. " COP, HS°F, Combus;ion Etticiency, or nrut, as <br />applicable. ' Ficw control types�. variable air volcme(VAV), constant valume (C�, or variable speed (VS). <br />