Laserfiche WebLink
acot Wasn.•ytcn s�ato <br />ProiectInfo <br />Project Description <br />BrieBy describe mechanical <br />system type and featur=s. <br />zeoi <br />coca <br />Phone: <br />State Nonresidential Energy Code <br />MastecCuts (Spaca 235) p Ewratt :all <br />1402 SE iverott Hall Way <br />Evase:t, NA <br />P.agis Cu�. <br />]201 Y.e:=o Blvd, Ctlina, MI 55139 <br />952-917-"!]77 <br />Date 11/3/2006 <br />For Building Dept. Use <br />❑ Indudes Plans Ilnclude documentation requlring compliance with commissioning requiremenls, Section 1416. <br />�l Simple System � Complex System � Systems Analysis <br />� Option �See Decision Flowchart (over) for qualifications. Use separate MECH-SUM for simple 8 complex systems.) <br />Schedules The follnwing information is required to be incorporated with the mechanical equipment schedules on the <br />plans. For projects without plans, fill in the requi:ed information below. <br />'If avallable. 2 As lested according to T3ble 74-1A lhrough 14-1G. � If required. ` COP, HSPF, Ccmbustion Effciency, or AFUE, as <br />applicable. ' Flow control types: variable a!r volume(VA�, constaat vniume (C�, er variable sp�ed (VS). <br />