Laserfiche WebLink
L�7 C997 <br />cD SJH <br />H <br />9 H rn <br />k c� <br />H xl <br />0H' <br />En H <br />Fx3 r�a" <br />th O tTl <br />H C7 <br />OH�y <br />H C-)1 O <br />(] V n <br />H <br />Z q.. <br />H13 <br />H <br />C: t7CA <br />t4 <br />ZH <br />HOWrn <br />C " <br />1 1 <br />TELECON REPORT <br />DATE HELD: March 3, 1992 <br />SUBJECT: Mervyn`s <br />Everett <br />SSOE Job No. 916250-70, 002 <br />CALL TO: Jeff McFall, City of Everett <br />CALL FROM: Kim Procuniei, SSOE <br />DISTRIBUTION: Jeff McFall <br />Bob Meza <br />John Hux <br />Dave Nevens <br />Phil Dregger <br />File <br />Called Jeff to verify acceptability of vapor barrier at Everett roof as satisfying UBC 1712(a). Jeff <br />was concerned about insulation that is on site. It is not "Sarnatherm" as specified but is labeled <br />"R-MAX:" In speaking with Technical Roof Services personnel, who are roofing consultants on <br />this project, I was assured that "R-MAX" and "Sarnatherm" meet the same UL requirements and <br />are in fact the same material, trade name "R-MAX." Jeff said that if the insulation met the UL <br />classification the roof system was approved. We are proceeding with roof system replacement. <br />Jeff also stated that fire treated wood is acceptable for in wall blocking at grab bars and fitting <br />room partitions. <br />Submitted: Kim Procunier <br />KP/rsr <br />vcR1 <br />SSOE, INC. • 200 MOTT FOUNDATION BUILDING • FUNT, MICHIGAN 48502 <br />