My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1402 SE EVERETT MALL WAY MERVYNS 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1402
>
MERVYNS
>
1402 SE EVERETT MALL WAY MERVYNS 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2022 12:40:56 PM
Creation date
2/13/2017 8:02:22 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1402
Tenant Name
MERVYNS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r+7 tTJ H <br />yy� <br />.t"HEn '. . <br />H TELECON REPORT M <br />DATE HELD: December 3,]99] <br />F3 z DEC 0 9 1991 <br />SUBJECT: Mervyn's <br />0IH-i C Everett Mail, Washington ivillii <br />I -I @ O SSOE Job No. 916250--00 CITY OF <br />Public Works Dept. Dept. <br />y CALL TO: Jeff McFall, City of Everett <br />z <br />g ti H CALL FROM: Morris Johnson, SSOE <br />C� t7 ca <br />DISTRIBUTION: Gayle Sherman, Mervyn's <br />z 1-3 CA Wayne Bartlett, Mervyn's <br />H 0 co Bob Meza, Mervyn's <br />John Hux, SSOE-Troy <br />Ken Hanson, SSOE-Troy <br />Tim Baker, SSOE-Nashville <br />Kim Procunier, SSOE-Flint <br />File <br />I asked Jeff what criteria he uses in determining when walls and roofs require insulation <br />("R" value) upgrading during a building refurbishment. I briefly described the intentions of the <br />remodel design for the site. Jeff stated the following: <br />1. The roof would require an energy calculation (and subsequent insulation <br />1Cupgrading if required) if the repaired areas of the roof exceed approximately 30% <br />of the overall roof area. The new membrane over the existing (repaired) <br />membrane is not a consideration for the calculation, only the repaired area. <br />(Where existing roof system is wet and requires replacement, the new roofing <br />system will meet and exceed the existing roof materials for "R" values.) <br />2. The exterior walls would require an energy calculation if the interior finished <br />surface was removed or replaced, and subsequent insulation upgrading would be <br />a .. necessary as determined by the calculation. (Existing exterior wall interior <br />surfaces will remain as present. Exterior surfaces will be pressure washed and <br />paint touch-up where required.) <br />3. The ratio or percentage of refurb cost to building value is not a consideration or <br />criteria used for determining when building envelope upgrading is required for <br />the Everett project. <br />Submitted: M. Johnson <br />�t ( MJ/rsr <br />WOO <br />SSOE, INC. • 200 MOTT FOUNDATION BUILDING • FLINT, MICHIGAN 48502 <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.