My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1402 SE EVERETT MALL WAY PAYLESS SHOE SOURCE 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1402
>
PAYLESS SHOE SOURCE
>
1402 SE EVERETT MALL WAY PAYLESS SHOE SOURCE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2022 12:53:01 PM
Creation date
2/13/2017 8:06:34 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1402
Tenant Name
PAYLESS SHOE SOURCE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential <br />2010 <br />2009 Wasiu,tilon State Energy Code Compliance Forms <br />Project Info Project <br />ror Nonresmenaa, anu mmwui„iv ��� �_••,•_ <br />Address EVERETT MALL <br />Date 5/10/2012 <br />--Dept <br />1402 SE EVERETT MALL WAY, SPACE 372 For <br />Building <br />grco5 -�a3 <br />EVERETT. WA 98208 <br />Applicant Name: VINCI V. SKARIA <br />Applicant Address: 10877 WATSON ROAD, ST. LOUIS, MO 63127 <br />Applicant Phone: (314) 821-1100 <br />Project Description <br />Briefly describe mechanical <br />system type and features. <br />P1 Includes Plans <br />7.5 TON PACKAGED GAS -FIRED ROOFTOP UNIT WITH 125 MBH <br />HEATING INPUT. UNIT HAS ENERGY MANAGEMENT" SYSTEM. <br />6 GALLON ELECTRIC WATER HEATER <br />Drawings must contain notes requireing compliance with commissioning requirements - Section 1416 <br />Compliance Option <br />O Simple System Q Complex System 0 Systems Analysis <br />(See Decision Flowchart (over) for qualifications. Use separate MECH-SUM for simple & complex <br />Equipment Schedules <br />The following information is required to be incorporated with the mechanical equipment schedules on <br />the plans. For projects without plans, fill in the required information below. <br />Coolin E uipment Schedule OSA CFM SEER Econmizer Heal <br />Equip. Equip Capacity' I Option or Recovery <br />ID Type Brand Name l Model No.' Bluth or Econo7 or EER IPLV <br />Exception" Y/N <br />nTv-1 <br />RTu <br />CARRIER <br />4excoDoe <br />88.34 hID <br />ECONo <br />11.0 EER <br />11.7 IEER <br />ECONO <br />N <br />Heatin E ui ment Schedule osA crm Heat <br />Equip. Equip Capacity2 4 Recovery <br />ID Type Brand Namel Model No.' Btu/h or Econo7 Input Bluh Output Btuh Efficiency <br />YIN <br />RTU-1 <br />RTU <br />CARRIER <br />4eTCDDOe <br />103 <br />ECONO <br />125 <br />103 <br />82 AFUE <br />N <br />Fan E ui ment Schedule - <br />Equip. Equip 1 CFM gp1 HP/BHP Flow Controls Location of Service <br />ID Type Brand Name' Model No. <br />FAN/LIG <br />EXHAUST <br />NUTONE <br />8663RP <br />108 <br />0.10 <br />FRANCT* ON <br />N/A <br />TOILET ROOM <br />HT <br />'If available. 2 As tested according to Table 14.1A through 14.1 O. ° If required. ° COP, HSPF, Combustion Efficiency, or AFUE, as <br />applicable. s Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). 0 Exception number from Section <br />
The URL can be used to link to this page
Your browser does not support the video tag.