Laserfiche WebLink
3. nny grading/lill on this sitc shall bc done so as to not impact the surrounding properties. <br />4. Special cl�argcs for connection to the sewer and water systems in accordance ���ith Ordina�cc <br />1998-94 and subsequent revision are applicable. Ti�ese charges are based on projected water <br />usage and can be substantiaL Applicant is encouraged to obtain a copy of die Ordinance and <br />dctermine estimated charges prior to building permit zpplic�tion. The aclual charges shall be <br />computcd by the Public Works Department per the ordinance in effect at the time and according <br />to the information on tlie approved plans at thc time ol�building permit issuance. <br />�. Lack of comment on thc plans submitted with the application does not constitute aprroval of <br />tl�cse plans. <br />6. City strcets and allcys are to be hept clear of dirt and debris nt all times during construction. <br />Dust suppression and sirect cleaning must occur as directed by the Public �i'orks Inspector. <br />7. �� one-year wairauty is m��uired on public improvements for �n amouut not less than 10% of tlie <br />cost of constructior. and shall run for onc ycar from the date of fi��al approval/issuance of the <br />lirst Occupmicy I'ern�it. <br />S. �1 two-year guarantce is requircd for private retention/detention or other drainage <br />trcatmcnUabatement facilities serving amas larger than one acre. <br />9. On-sitc water main will bc staked witl�in an easement to tlre City. The easement will be <br />submitted lo the City prior to issuance of permits. <br />10. As-builts of storm sewer, sanitary sewer, and water systems will bc required to Ue submitted per <br />City Design and Construction Standards and Specifications for Development. <br />1 l. Any Uroken or damaged public sidewalk shall be repaired/replaced per the direction of the City <br />of Gverett public �vorks inspector. <br />12. 'rhe construction plans must be designed Gom a site survcy perfornicd by a licensed State of <br />P✓ashington land surveyor. <br />13. All exposed ground must bc reseeded within 30 days of thc completion of construction. If <br />reseeding is not practical du. to weather or scasonal problems, the ground must be �overed wid� <br />mulcli as dirccted by tlic City Engineer. <br />1-1. Temporary erosion control measures lor construction activity must be operational prior to <br />conuncnccmcnt af any dcaring or earthwork. <br />