My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1402 SE EVERETT MALL WAY REGAL CINEMAS 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1402
>
REGAL CINEMAS
>
1402 SE EVERETT MALL WAY REGAL CINEMAS 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2019 7:59:54 AM
Creation date
2/13/2017 8:08:21 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1402
Tenant Name
REGAL CINEMAS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is uncle.u� �vhat ���ill happcn to drainage in the interim. In addition, the new facil;[ies must <br />be constructed as early in the pioccss as possible to provide mitigation For the projcct. <br />1'he presence of the new 36-inch LCPG on the TGSC plan is confusing (sheets G2.0 and <br />G2.1). <br />On shcet G2.0, notcs arc gi��cn for cxisting cbs 9-15. I cannot tind cbs 13 and 15 <br />Sheet 9.0 <br />Il is unclear �i�hat �vill happen to the apen ends of thc existing pipes that will be filled <br />when the pond bottoms are raised. <br />The location of tlie water main must be shown in cross section GC. <br />Unless the west poi�d is lined, the dcsign of this pond will resiilt in an incmase of almost <br />9 fcet of s!anding hydraulic head on ,he upstream side. This will creute a hJ�draulic <br />gradient across tlie dam that doesn't currently exist e�cept in large storms. The effects of <br />this change must be analyzed by a geotechnical engineer and mitigated iC necessar}� to <br />protectthe structuralintegrity ofthe dam. <br />On cross section G-G, it looks like the upper 24" SD is conncctcd to the catch basin on thc <br />west sidc of die trail. Ho�vever, on the plan view, this docsn't appear to be the case. This <br />item should be clarificd. <br />The cxisting 2a-inch pipe that is connecting the two ponds will be submcrged, proUabl�• <br />lias open joi�its, and serves no apparent function. It should bc plueged and abandoneti. <br />Cross section G-G sho�vs only 1 foot of live storage in the pond. <br />'1'he call-out for the 5' bench on cross section G-G looks like a wall... <br />Che design of tlic ponds �vill result in a siwation where thc saturated cicvation oCthc <br />henn/trail behveen the two ponds will try and reach an elevation of 479. There is a year <br />1969 manhole and se�ver main to the south that may be impacted, in terms of incrcascd <br />infiltration, by die increase in ground water elevatian. <br />I he �ollowin� addition�l notes shall be provided on the drainaec nlans: <br />l he ponds must pass a leak test before the project will receive final approval. Ponds sl�all <br />bc fillcd witl� water to the elevation of the outlets, and inllow prevented for 24-hours. �I�o <br />pass the Ic�k test, thc watcr cicvation may not dron more than 2-inches in the 24-hour <br />�icriod. Pond soils should hc saturatcd beforc hecinning the 34-hour tcst period. <br />� <br />s �jrimmcrin\�cord'�pr_ cvcrc�t mull �'J <br />
The URL can be used to link to this page
Your browser does not support the video tag.