Laserfiche WebLink
NTrepanier Engineering <br />ssional Civil Engineering <br />August 28, 1987 <br />JOB NO. 67-041 <br />Public Works Department <br />City of Everett <br />Everett, Wash. 98201 <br />ATTN: Gordon Witcher <br />Gentlemen: <br />RE: Right of Way Cost Estimate <br />Building for City Radiator <br />Everett Mall Way and 2nd Ave. S.E. <br />Project Costs are as follows: <br />FRONTAGE IMPROVEMENTS <br />Demolish Ex. New Driveway & <br />Replace w/Sidewalk, C & G <br />Widen 2nd 3' Avg. x 150 l.f. <br />Curb, Gutter & Sidewalk <br />120 l.f. @ $15.00/l.f. <br />Conc. Driveway @ $700 <br />TOTAL ESTIMATED COST <br />ON -SITE PAVING <br />14,215 S.F. <br />$1,000.00 <br />x $1/s.f. 450.00 <br />1,800.00 <br />700.00 <br />$3,950.00 <br />Please call if you have any further questions concerning this billing. <br />Sincerely, <br />f <br />Ted Trepanier, P.E. <br />3201 Broadway - Suite E • Everett, Washington 98201 • Everett 12061 259-5556 <br />