Laserfiche WebLink
�ai <br />�' <br />BARGHAUSEN CONSULTING ENGINEERS, INC. <br />"Land Planning, Survey, and Design Specialists" <br />September 3, IS87 �j � � " � " � � <br />SEPlr1987 <br />............. ........... ............ <br />c;ry o Everett . ...... <br />Building Department CITY OF EVERETT <br />3?�n redar Strees Pub:ic Works Deot. <br />Everett, WA 98201 <br />Attn: Mr. Larry Callahan <br />RE: ARCO AM/PM Mini-Market Facility Located at 220 S.E. Everett Mall 13'ay <br />City Permit No. 17793 <br />ARCO FAC Na. 5446/Our ]ob No. 2197 <br />Dear Larry: <br />As earlier discussed, the energy calculations submitted with the Building Permit <br />Application package on this project reflected that R-19 insulation was adequate for the <br />ceiling, whereas ;he plans called for R-30 insulation. You indicated that the energy <br />calculations constituted HVAC design based on Chapter 4 method in lieu of prescriptive <br />method and would therefore be acceptable. <br />This letter is to confirm that R 19 insulation will be accepted by the city for <br />the ceiling of this facility. It would be appreciated if ��ou could acknowledge this <br />acceptance in writing for our files and also inform your inspector of this revision. <br />Please advise if you have any questions or need of additional information in this regard. <br />Sincerely, <br />l�l�— <br />A1 Kendall <br />Project Engineer <br />AK/sm <br />C276.15 <br />cc: Mr. Chuck Hutchens, ARCO <br />Mr. Cary Sweet, CSC De��elopment <br />6625 South 190th, # 102 • Kent, Washington 98032 •(206) 872-5522 <br />