Laserfiche WebLink
everett <br />e <br />INSPECTION REPORT <br />Address ��� �. �� Il'Y,(_ � � ��% <br />Contractor � <br />Owner � �.l ) <br />Date ��� <br />TYPE OF INSPECTION REQUESTED <br />C; BLDG: Pmt. No. ❑ MECH: Pmt. No. <br />/ELEC: Pmt. No. _/�_❑ PLBG: PmL No. <br />❑ Temp. Elect. ❑ Framing <br />❑ Footing ❑ Drywall, Nailing <br />❑ Foundation ❑ Shear Nailing <br />❑ Ductwork ❑ Grid <br />❑ Wood Stove ❑ Rough•In <br />❑ Masonry ❑ Service <br />� Gas Piping <br />❑ Consultation <br />❑ Groundwork <br />❑ Struct. Slab <br />��Final <br />� -- <br />PROVAL ❑ PARTIAL APPROVAL <br />❑ VI ATION ❑ CORRECTION RE4UIRED <br />❑ Corrections listed below MUST BE MADE be(ore work can be approved. <br />❑ Please contact inspector and arrange for appointmenl. <br />❑ Was not able to periorm inspection. <br />❑ CALL 259•8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIQR TO OCCUPANCY. <br />Inspector <br />