My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
221 SE EVERETT MALL WAY BASE FILE 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
221
>
BASE FILE
>
221 SE EVERETT MALL WAY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2019 5:25:20 PM
Creation date
2/13/2017 8:10:50 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
221
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i . ��cr,cRouiao <br />6) 7he prop�sal calis for the construction of an otfite/warehouse <br />build(ng consisting of 14,000 ftZ of office space aad 7000 ftZ <br />of warehouse space. It is anticipated that there �ill be <br />approximately 6 offices. <br />7) The s(te is located on the northwesterly side of Saeth Broadway <br />on approximately I.2 acres. �he vegetation on the site consists <br />primarily of scrub alder and typical undergrowth sueh as salal, <br />blackberry vines, etc� The site is level��t�he proposal cails <br />for the site to be�cleared. <br />I1. ENVIRONMEIJTAL IMPACTS <br />I bdc) Approximately 100� of the site will be graded ta accomodate <br />the building and parking area. Therewill be no major cuts <br />ot fills (in excess of 4 feet). <br />I e) Water erosion may increase on the site during caistructfon. <br />This will be mitigated by constructing temporary erosion <br />sedimentation control facilitles. <br />2 a) ApFroximately 40 cars will be associate with this development <br />and will contribute CO3 N0, SOq emissions found 6n the ambfent <br />air. Temporary deterioration will occur during construction <br />due to dust and slash burning. ,.., <br />3 b) Yes, Grading and fmpervious surface applications vill change <br />absorption rate on approximately 40p of the site. However, <br />storm water runoff will be controlled by on-site datentton, <br />thus raducing the peak discharge to existing conditions. <br />4 a) Yes, Tha site wfll be cleared of all its vegetatdon which <br />malnly coasists of scrub alder and undergrow'h sucn as salal, <br />blackberry vines, ect. �++�sc,�e�utiYi��� i1E4wa�oe:� . <br />5 a8b) Yes, Nafiiva small animals such as common squtrreas, chipmunks <br />etc. wiil be eliminated due to destruction of thair natural <br />habitats. . <br />6) Yes, Construction noise wlll be intermittently hi�h during <br />construction period. Ambient noise levels will i�ncrease <br />only in the dayttme due to daily traffic estimate�� at . <br />approxinately 200 average daily trips (5X40), , <br />13 a) Yes, Approximately 170 average daily vehicie ttrps (5X40). <br />i . <br />13 b) Off streaY parking will be provided. ,, <br />13 c) Yes, A srnall increase cf traffic will be generatr� on . <br />South 6roaCway (See above). <br />16 a-f) Yes, AIl utilitles are available and adequate and when•. <br />necessary, th�y will be extended Into the site. <br />IB) Ye,, This daveiopme�nt will convc;rr a wooded site inin a <br />warehousa and office spoces with subsaquent aastiaiic - <br />
The URL can be used to link to this page
Your browser does not support the video tag.