Laserfiche WebLink
i . ��cr,cRouiao <br />6) 7he prop�sal calis for the construction of an otfite/warehouse <br />build(ng consisting of 14,000 ftZ of office space aad 7000 ftZ <br />of warehouse space. It is anticipated that there �ill be <br />approximately 6 offices. <br />7) The s(te is located on the northwesterly side of Saeth Broadway <br />on approximately I.2 acres. �he vegetation on the site consists <br />primarily of scrub alder and typical undergrowth sueh as salal, <br />blackberry vines, etc� The site is level��t�he proposal cails <br />for the site to be�cleared. <br />I1. ENVIRONMEIJTAL IMPACTS <br />I bdc) Approximately 100� of the site will be graded ta accomodate <br />the building and parking area. Therewill be no major cuts <br />ot fills (in excess of 4 feet). <br />I e) Water erosion may increase on the site during caistructfon. <br />This will be mitigated by constructing temporary erosion <br />sedimentation control facilitles. <br />2 a) ApFroximately 40 cars will be associate with this development <br />and will contribute CO3 N0, SOq emissions found 6n the ambfent <br />air. Temporary deterioration will occur during construction <br />due to dust and slash burning. ,.., <br />3 b) Yes, Grading and fmpervious surface applications vill change <br />absorption rate on approximately 40p of the site. However, <br />storm water runoff will be controlled by on-site datentton, <br />thus raducing the peak discharge to existing conditions. <br />4 a) Yes, Tha site wfll be cleared of all its vegetatdon which <br />malnly coasists of scrub alder and undergrow'h sucn as salal, <br />blackberry vines, ect. �++�sc,�e�utiYi��� i1E4wa�oe:� . <br />5 a8b) Yes, Nafiiva small animals such as common squtrreas, chipmunks <br />etc. wiil be eliminated due to destruction of thair natural <br />habitats. . <br />6) Yes, Construction noise wlll be intermittently hi�h during <br />construction period. Ambient noise levels will i�ncrease <br />only in the dayttme due to daily traffic estimate�� at . <br />approxinately 200 average daily trips (5X40), , <br />13 a) Yes, Approximately 170 average daily vehicie ttrps (5X40). <br />i . <br />13 b) Off streaY parking will be provided. ,, <br />13 c) Yes, A srnall increase cf traffic will be generatr� on . <br />South 6roaCway (See above). <br />16 a-f) Yes, AIl utilitles are available and adequate and when•. <br />necessary, th�y will be extended Into the site. <br />IB) Ye,, This daveiopme�nt will convc;rr a wooded site inin a <br />warehousa and office spoces with subsaquent aastiaiic - <br />