My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
304 SE EVERETT MALL WAY PANERA BREAD 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
304
>
PANERA BREAD
>
304 SE EVERETT MALL WAY PANERA BREAD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2022 4:03:14 PM
Creation date
2/13/2017 8:12:27 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
304
Tenant Name
PANERA BREAD
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS DEPARTMENT / ` i c 11 � <br />Utilities Division, A Cedar Street V,�/r/ eet 111 <br />Everett tNA 95201 <br />425-257-8800 � MA11T7 <br />VMS <br />Date Paid <br />Receipt # <br />Cost of Work Order _ Work Order# <br />X Cost of Service Order _ Service Order # <br />Telephone # <br />Contact Person <br />Requested By Gordon Witcher Date of Request <br />Property Owner (name) Panera Bread <br />Charge Cost to (name if different than owner) <br />City Zip <br />Address <br />Installation Location 304 SE Everett Blvd. <br />Installation type/description/size/etc. Excavate tqp 4" on 6" connect to contractor pipe and <br />V The following estimate is based upon the Utilities Division providing all labor, equipment, <br />materials, restoration, and final hook-up. <br />Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br />date to allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the <br />owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br />installation. <br />*Deposit must be paid prior to ordering parts or scheduling work. <br />._ ...... 11 Av TTA TIC A CiV <br />Wcku1Zfet.Ha-hew CJx 06 cc: Bldg. Permit Center <br />Material $1141.00 Mark Sadler <br />$1526.00 Gordon Witcher <br />Labor and Benefits Matt Welbom <br />Equipment Rental $750.00 Mike Ward <br />$60.00 Randy Allen <br />Tax Paul McKee <br />TOTAL _ $34-7fi00 }q7-7-OD <br />Prepared by: Mike Ward '7 7, t Date Estimate Prepared 2/15/13 <br />Accepted by: Representing <br />ESTIMATE GOOD FOR G NIONTHS <br />S:1#Common\cicrical\Cost.est\'012\ 304 SE Everett Mall Way4 <br />I oft <br />
The URL can be used to link to this page
Your browser does not support the video tag.