Laserfiche WebLink
5. NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED <br />LANDSCAPE ARCHITECT BY THE LANDSCAPE CONTRACTOF <br />6. ALL PLANF MATERIAL SHALL COMPLY WITH THE LATEST <br />NURSERY STOCK, AMERICAN ASSOCIATION OF NURSERYIv <br />7. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR ON-GOI <br />MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ANY f <br />OCCUR PRIOR TO OWNER ACCEPTANCE SHALL BE THE <br />8. WARRANTY FOR LANDSCAPE MATERIALS SHALL BEGIN OI` <br />REPRESENTATIVE AFTER THE COMPLETION OF PLANTING <br />ACCEPTANCE WILL BE CONSIDERED. LANDSCAPE CON1R� <br />THE OWNER'S ACCEPTANCE INSPECTION. REMOVE AND F <br />IMMEDIATELY UNLESS REQUIRED TO PLANT IN THE SUC( <br />REPLACEMENT OF EACH TREE AND SHRUB WILL BE RE( <br />CONTRACTOR'S ERRORS. <br />9. CONTRACTOR WILL SUPPLY FINISHED GRADE AND EXC.A'v <br />DEPTH IN ALL PLANTING BEDS AND 4" TOPSOIL DEPTH <br />PARKING LOT ISLANDS 6" ABOVE ADJACENT CURBS WITI <br />CURBS AND ALONG SIDEWALKS AND COMPACT TO TOP <br />PEDESTRIAN WEIGHT WITHOUT SETTLING. <br />10. ACCEPTANCE OF GRADING AND SOD SHALL BE BY LANE <br />REPRESENTATIVE. THE LANDSCAPE CONTRACTOR SHALL I <br />FINAL ACCEPTANCE HAS BEEN RECEIVED. MAINTENANCE <br />REPLACEMENT OF WASH -OUTS AND OTHER OPERATIONS <br />CONDITION. UPON FINAL ACCEPTANCE BY LANDSCAPE A( <br />OWNER WILL ASSUME ALL MAINTENANCE RESPONSIBILITIE <br />11. LANDSCAPE CONTRACTOR SHALL GUARANTEE NEW PLANT <br />FROM THE DATE OF OWNER ACCEPTANCE WITH ALL REP <br />COST TO THE OWNER. <br />12. PLANT MATERIAL LOCATIONS SHOWN ARE DIAGRAMMATIC <br />AS REQUIRED. <br />13. REPAIR ALL DAMAGE TO PROPERTY FROM PLANTING OPE <br />14. OWNER OR OWNER'S REPRESENTATIVE SHALL INSPECT L <br />TO REJECT AND WITHHOLD PAYMENT ON ANY PLANT MA <br />NOT MEETING SPECIFICATIONS <br />15. LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />LANDSCAPING EACH DAY. AT ALL TIMES SHALL THE SIDE <br />DEBRIS. REMOVE SURPLUS SOIL AND WASTE MATERIAL, <br />DISPOSE OF SAME IN ACCORDANCE WITH FEDERAL, STAT <br />LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />PRIOR TO AND DURING CONSTRUCTION. THE LANDSCAPE <br />AND ENTRY OF SOIL -BEARING WATER .AND AIRBORNE DI, <br />PUBLIC STORMWATER FACILITIES. <br />lawanul ►• <br />1. NO PLANTING TO BE INSTALLED UNTIL GRADING AND CON <br />IMMEDIATE AREA. <br />2. SEE CIVIL/SITE PLAN FOR ALL SITE DIMENSIONS, SQUARE <br />OF ALL SITE IMPROVEMENTS. <br />3. IF THE LANDSCAPE CONTRACTOR PERCEIVES ANY DEFICIE" <br />OR ANY OTHER SITE CONDITION WHICH MIGHT NEGATIVELY <br />SURVIVAL, OR GUARANTEE, THEY SHALL BRING THESE DEF <br />ARCHITECT PRIOR TO INSTALLATION. <br />4. PRIOR TO ANY LAND CLEARING OR CONSTRUCTION, TREE <br />CONTRACTOR. THIS FENCING SHALL BE INSTALLED AT THE <br />PROTECTED) ACCORDING TO THE TREE PROTECTION DETAIL <br />OF THE PROJECT. NO CUTTING, FILLING OR TRESPASSING <br />WITHOUT APPROVAL. <br />5. ALL PLANTS TO BE INSTALLED AS PER PLANTING DETAILS <br />SAME RELATIONSHIP TO GRADE AS WAS GROWN IN NURSE <br />DRAINING SOILS ARE EVIDENT, PLANT HIGHER. REMOVE AL <br />ROOT BALL AND FROM TREE TRUNKS. <br />6. ONE SHRUB PER TYPE AND SIZE IN EACH PLANTING BED <br />(COMMON OR LATIN NOMENCLATURE) WITH A PLASTIC TAG <br />OWNER ACCEPTANCE. <br />7. SEED AND/OR SOD ALL AREAS DISTURBED DUE TO GRADI <br />SOD/SEED ABUTS PAVED SURFACES, FINISHED GRADE OF <br />ELEVATION OF TRAIL, SLAB, CURB, ETC. SOD SHALL BE L <br />STAGGERED JOINTS. ON SLOPES STEEPER THAN 3:1 OR II <br />TO THE GROUND. <br />8. PRUNE, THIN AND SHAPE TREES AND SHRUBS ACCORDINC <br />MINIMUM 4" MULCH CUP AT ALL TREES NOT PLANTED IN <br />9. EXISTING LAWN AREAS TO BE SAVED AND AREAS THAT AR <br />INSPECTED TO DETERMINE VIABILITY. IF i HE EXISTING LAWI <br />FREE FROM WEEDS, LAWN MAY NOT REQUIRE REPLACEMEP <br />OR IS PART OF THE APPROVED PLAN, THEN THE FOLLOWI <br />FOUND TO BE IN POOR CONDITION MUST FIRST BE SPRAT <br />EXISTING LAWN AND WEED AREAS. WAIT A MIN. OF (10) L <br />REMOVE ALL DEAD SOD & WEEDS TO A MIN. DEPTH OF ( <br />NEW TOPSOIL TO ALL LAWN AREAS. BACKFILL AND COMPA <br />PRIOR TO SODDING. REGRADE TO ELIMINATE ALL BUMPS A <br />LAWN FOUND TO BE IN GOOD CONDITION, BUT WITH BARE <br />BY FILLING IN LOW AREAS, RAKING, OVERSEEDING AND TO <br />BY INITIATING A WEED AND FEED PROGRAM. <br />10. CONVERSION OF ALL ASPHALT AND GRAVEL AREAS TO LAN <br />MANNER: <br />A. REMOVE ALL ASPHALT, GRAVEL AND COMPACTED <br />THE DEPTH OF SUB BASE AND DISPOSE OF OF <br />B. REPLACE EXCAVATED MATERIAL W/ GOOD, MEDIL <br />YELLOW CLAY) TO A MIN. OF 2" ABOVE TOP OF <br />AND CROWN TO A MIN. OF 6" ABOVE ADJACENT <br />NOTED OTHERWISE ON THE PLANS. <br />C. IF CONVERSION TO LANDSCAPE OCCURS IN AN E, <br />REPLACE EXCAVATED MATERIAL TO 4"-6" BELOW i <br />TEXTURED PLANTING SOIL (LOAM OR LIGHT YELLOW, <br />FYICTIAIC 1'UAf7C'C ACTCC CAOTU or ' ,.u+ <br />