Laserfiche WebLink
2009 Washington. State Energy Code Compliance Forms far Nonresidential and Multifamily Residential 1I l f L( - 0 Z <br />2009 Washington State Energy Code Compliance Forms for Nonresidential and Muaifamiy Residential Revised February 2011 <br />Project Address ea "ERR HALL NAY / ae Sap AV Dale 6�17/2012 <br />Washing on informationlate dents I naryEnertoCode a mechanical permit application for compliance with the mechanical requirements in the <br />Applicability Code Location Building Department <br />( es, no, is) I Section Component Information Required on Plans Notes <br />HVAC REQUIREMENTS (Sections 1401-1424 <br />1411 JEquipment <br />Performance <br />Yee <br />1411.1 <br />Minimum efficiency <br />Equipment schedule with type, capacity, efficiency <br />M2.2 <br />Yes <br />1411.1 <br />Combustion hill. <br />Indicate intermittent ignition, flueldraft damper & jacket loss <br />M4.1 <br />N.A. <br />1411.1 <br />Air-cooled chiller <br />Provide total air and water chiller capacity <br />N.A. <br />1411.2.1 <br />Water-cooled chiller <br />Full -load and NPLV values adjusted for any non-standard conditions <br />N.A. <br />1411.4 <br />Pkg. elec. htg.& clg. <br />List heat pumps on schedule <br />N.A. <br />1411.5 <br />Unenclosed Heat <br />Indicate radiant heat system and occupancy controls <br />_ <br />1412 <br />HVAC Controls <br />1412.1 <br />Tempeature zones <br />Indicate locations on plans <br />M2.1 <br />1412.2 <br />Deadband control <br />Indicate 5 degree deadband minimum <br />M4.1 <br />RN.A. <br />1412.3 <br />Humidity control <br />Indicate humidistat <br />1412.4 <br />Setback and Shutog <br />Indicate thermostat with 7 day program capability & required setback <br />M4.1 <br />1412 4.1 <br />Dampers <br />Indicate damper location, leakage rate, control type, & maz. leakage <br />M4.1 <br />N.A. <br />1412A.2 <br />Optimum Start <br />Indicate optimum start controls <br />N.A. <br />1412.5 <br />Heat pump control <br />Indicate heat pump lhermostant & outdoor lockout on schedule <br />N.A. <br />1412.6 <br />Combustion heating <br />Indicate modulating or staged control <br />Ysa <br />1412.7 <br />Balancing <br />Indicate balancing features on plans <br />M4.1 <br />N.A. <br />1412.8 <br />Ventilation Control <br />Indicate demand control ventilation for high -occupancy areas <br />N.A. <br />1412 9 <br />Loading Dock & <br />Garage Ventilation <br />Indicate enclosed loading dock & parking garage ventilation system <br />activation and control method. <br />Yee <br />1422 <br />Thermostat interlock <br />Indicate thermostat interlock on plans <br />M4.1 <br />N.A. <br />1432.2.1 <br />Temperature Reset <br />1-dicate temperature reset method <br />Air l Water Economizers <br />1413 <br />1412.1 <br />Single zone systems <br />Indicate multiple cooling stage control capability. <br />M4.1 <br />14'13.1 <br />Air Econo Operation <br />Indicate 100%capability on schedule <br />M4.1 <br />PA. <br />1413.1 <br />Wtr Econo Operation <br />Indicate 100% capacity at 45 degF db & 40 deg F wb <br />1413.2 <br />Wlr Econo Document <br />Indicate max. OSA condition for design clg load & equipment <br />performance data. <br />Yes <br />7413.3M4.1 <br />Integrated operation <br />Indicate capability for partial cooling <br />N.A. <br />1413.4 <br />Humidification <br />I Indicate direct evap or fog atomization wl air economizer <br />1414 <br />Ducting Systems <br />Yee <br />1414.1 <br />Duct sealing <br />Indicate duct design pressures, sealing, and testing requirements <br />M4.1 <br />Yea <br />1414.1.2 <br />Low press. dud test <br />Indicate applicable low pressure duct systems shall be leak tested <br />M4.1 <br />N.A. <br />1414.1.3 <br />High press. dud test <br />Indicate high pressure duct systems shall be leak tested, and identify <br />the location of this ductwork on plans <br />Yee <br />1414.2 <br />Duct insulation <br />Indicate R-value of insulation on duct <br />M4.1 <br />1416 <br />Piping Systems <br />N.A. <br />1415.1 <br />Piping insulation Indicate R-value of insulation on piping <br />1Completion <br />Requirements <br />Yee <br />1416.3.2 <br />System Balancing <br />Indicate air and water system balancing requirements <br />M4.1 <br />Yee <br />1416.3.3 <br />Functional Testing <br />Provide sequence of operations and test procedures. <br />M4.1 <br />Yee <br />1416.3A <br />Documentation <br />Indicate O&M manuals, record drawings, staff training <br />M4.1 <br />Yee <br />1416.3.5 <br />Comm. Report <br />Indicate requirements for final commissioning report <br />M4.1 <br />Yee <br />1416.4 <br />Compliance Chklist <br />Submit to building official upon substantial completion. <br />M4.1 <br />Yee <br />Mechanical Summary Form <br />Completed and attached. Equipment schedule with types, inputfoutput, <br />efficien , cm, hip, economizer <br />M2 2 <br />OP <br />