Laserfiche WebLink
-TO BE COMPLETED BY APPLICANT <br />Ev ALUATION FOR <br />AGENCY USE ONLY <br />c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, <br />muck)? If you know the classification of agricultural soils, specify them and note anv prime <br />farmland. Soils tests currently underway, <br />d. Are there surface indications or history of unstable soils in the immediate vicinity? If so. <br />describe. <br />;o <br />e. Describe the purpose, type, and approximate Quantities of aria tilling or gradd' g pro- <br />posed. Indicate source of till. Grading proposra - Some firl at west en <br />of property (Source from east grading). <br />L Could <br />siontocouldroccurresult <br />s a result. cutsc earin¢,°no?weveoi•generallydescnbe. <br />proper erosion control during construction should be <br />easy to maintain. <br />S. About what percent of the site will be covered with impervious surfaces after project <br />construction (for example, asphalt or buildin�¢5)? <br />93%-94% site covered with asphalt dnd building. <br />h. Proposed measures to reduce or control erosion. or other impacts to the earth, if anv: <br />Landsc,,ping, on -site water system tied into existing cite <br />system with contribution into city drainage fund. <br />=. Air <br />a. What types of emissions to the air would result from the Proposal (i.e.. dust, automobile. <br />odors, industrial wood smoke) during construction and when the project is completed? If <br />any, generally describe and give approximate quantities if known. <br />Only the normal dust/odors during construction and <br />obvious air emissions from autos being driven to <br />the facility. <br />b. Are there any off -site sources of emissions or odor that may affect your proposal? If so. <br />generally describe. <br />None <br />c. Proposed measures to reduce or control emissions or other impacts to air, if any: <br />None <br />