Laserfiche WebLink
r <br />Aoplicatior For <br />PUBLIC WORKS PERMIT <br />Public Worxs Perrt *9-135� <br />Bldg. D•PL <br />Public Worl,s Fee S Tole) Fee _ <br />Less APPI Fee Pdel S <br />Print or Type Only Bopnce Dun <br />Al dviftme. Au%'oa_ <br />Owner Mach j Address City Zip Phone <br />Applicant Mailing Address City Zip Phone <br />DesOnL. Proposed Work <br />Protect Address (if known) <br />Attach four t4) copies of plans for proposed work - Draw to scale and note the following as <br />• Property Lines <br />• Outline and dimensions of all existing and <br />proposed structures on the Int <br />• Existing and proposed utilities <br />• Centerline of street <br />• Indicate North <br />• Show any proposed grading changes <br />• Show measurements <br />PERMIT CONDITIONS <br />1. All calls for inspection shill be made 24 hrs. in advance - phone 259.8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1 .800-424.5555. <br />11n� Irari <br />Approved for Construction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />everett PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett. WA 98201 <br />Phone: 259-8810 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />Im <br />O <br />n <br />z <br />O <br />M <br />The undersigned owner/applicant hereby agrees to hold and save harm• <br />less the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public property damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />