Laserfiche WebLink
everett INSPECTION REPORT I <br />eAddress l _IN% <br />ContractorC�J��L! <br />Owner Fall j <br />�Yo C <br />Date — <br />TYPE OF INSPECTION REQUESTED <br />[! BLDG: Pmt. No. <br />C MECH: Pmt. No. <br />XELEC: Pmt. No. <br />�❑ PLBG: Pmt. No. <br />❑ Temp. Elect. <br />O Framing ❑ Gas Piping <br />❑ Footing <br />❑ Drywall, Nailing ❑ Consultation <br />❑ Foundation <br />❑ Shear Nailing O Groundwork <br />❑ Ductwork <br />❑ Grid ❑ Struct. Slab <br />C Wood Stove <br />❑ Rough -In YFinal <br />❑ Masonry <br />❑ Service C _ <br />APPROVAL <br />❑ PARTIAL APPROVAL <br />". ❑ VIOLATION <br />❑ CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />❑ CALL 259-8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector 1IV\ >i Dale <br />