Laserfiche WebLink
00G�f INSPECTION REPORT X <br />Address <br />Contractor•—e <br />Owner---=�1 — <br />Date <br />APPROVAL -) PARTIAL APPROVAL <br />J VIOLATION J CORRECTION REQUESTED <br />J Corrections listed below MUST BE MADE before work can be approved. <br />J Please contact inspector and arrange for appointment. <br />J Was not able to perform insp-3ction. <br />J CALL 259-8810 FOR REINSPECTION — 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />- k <br />Inspector <br />Date <br />J Temp. Elect. <br />J Footing <br />Ll Foundation <br />J Ductwork <br />J Wood Stove <br />:1 Masonry <br />J BLDG: Pmt. No. <br />TYPE OF INSPECTION REQUESTED <br />U Framing J Gas Piping <br />J Drywalr, Nailing J Consultation <br />J Shear Nailing J Groundwork <br />J Grid J Struct. Slab <br />U Rough -in J Final <br />J Service ❑ Insulation <br />J Other✓A <br />❑ MECH: Pmt. No. <br />XEC: Pmt. No. 5-0/42 J PLBG: Pmt. No <br />