Laserfiche WebLink
Date <br />Application For <br />PUBLIC W09KS PERMIT <br />Print or Type Only <br />Public WorksPermit <br />Bldg. Dept. <br />apl. 4 �r� <br />a �7— <br />Public Works Fee <br />Total Fee g------- <br />Lest Appl, Fee PaiO 5-- <br />Balance Due <br />" / �CL� Sew <br />Ad-ress City Zip Phone <br />(053 3P7k <br />Phone <br />Describe Proposed Work-- <br />U1 <br />Project Address (if known) E <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the followiftg as applicable: <br />• Property Linos • Centerline of street <br />• Outline and dimensions of all existing and • Indicate North <br />CA <br />proposed structures on the lot • Show any proposed grading changes <br />• Existing and proposed utilities • Show measurements M <br />DO NOT WRITE BELOW THIS LINE O <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hrs, in advance- phone 259.8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424.5555. <br />0 <br />a <br />Approved for Construction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />everett PUBLIC WORKS DEPARTMENT <br />Ever Cedar Street <br />Everett, WA 98201 <br />Phone:259-8810 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages. costs, <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public property damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON ThiS <br />PROJECT OVER 90 DAYS DURATION. <br />