My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
305 SE EVERETT MALL WAY ITT FINANCIAL 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
305
>
ITT FINANCIAL
>
305 SE EVERETT MALL WAY ITT FINANCIAL 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2022 9:13:33 AM
Creation date
2/13/2017 8:15:27 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
305
Tenant Name
ITT FINANCIAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 7, 1989 <br />ITT Financial Corp <br />305 SE Everett Mall Way <br />Everett, WA 98204 <br />Job Address: 305 SE Everett Mall Way <br />Permit Number(s): 20139 (Building) <br />Date of Permit(s): May 27, 1988 <br />CITY OF <br />everett <br />PUBLIC WORKS DEPARTMENT <br />32M CEDAR STREET <br />EVERETT. WASHINGTON <br />98201 <br />A review of our inspection records reveals that the la-t inspection made at <br />the subject address was on June 13, 1989 (cony enclosed). <br />Section 303(b) of the Uniform Building Code provides that permits expire by <br />limitation and become null and void if the building or work authorized by <br />permit is suspended, after the work is commenced, for a period of 180 days. <br />The Code also requires final inspection prior to occupancy for all permits <br />issued, and it is the responsibility of the permit holder to call for the <br />necessary inspections. Because of these time frames, your permit has already <br />expired. <br />However, the City of Everett is at tt:is time extending a one-time grace <br />period to holders of recently expired permits. If you wish to recommence <br />work you may renew your permit at no cost for an additional 180 day period <br />by submitting a written rfauest to this office. The renewal request must <br />reach us by April 3, 1989. Any corrections required must be completed and <br />final approval obtained before April 3rd. Permits that have been neither <br />finaled not renewed by that date will expire. To renew the work or obtain <br />an inspection will then require the payment of a fee. <br />You may mail or deliver written requests to our office at 3200 Cedar Street, <br />Everett, WA 98201. If you have questions or want to request an inspection, <br />please call us at 259-8810, 8:00 AM to 5:00 PM, Monday through Friday. <br />Sincerely, <br />ALFRED R. THEAL, P.E. <br />Public Works Dire.:tor <br />u, wL &/ <br />By: Margaret McLeod <br />Building Department <br />cc: Clinton Custom Builders <br />STREETS REAL PROPERTY/ TRANSIT MOTOR BUILDING PUBLIC UTILITIES CONSTRUCTION ENGINEERING TRAFFIC ENGRI <br />2598620 LI 0', 2W8803 VEHICLES 259-OBW SERVICES 259.8800 INSPECTION 259SEW SIGNAL MAINTENANCE <br />259 Bem 2598802 259-88W Wat., Be.., 259 saw 2598800 <br />D,am.9. <br />
The URL can be used to link to this page
Your browser does not support the video tag.