Laserfiche WebLink
everett <br />e <br />INSPECTION REPORT <br />Address ��� �l'ri�'/�'/ jaJ,� �.� �'1 / � <br />-T_..�_.�.s�„� <br />Contractor .����--� <br />Owner � �i����,�' � � /'��— <br />�� <br />Date � � C�_�___ <br />TYPE OF INSPECTION REQl;ESTED <br />' BLDG: Pmt No. <br />[7 MC�H: Pmt. No. <br />C� ELEC: Pmt. No. � PLBG: Pmt. No. ��_ <br />❑ Temp. Elect. ❑ Framing O Gas Piping <br />❑ Footing ❑ Drywall, Nailing ❑ Consultalion <br />❑ Foundation ❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork ❑ Grid ❑ S;ruct. Slab <br />❑ Wood Stove ❑ Rough-in (,�ir,al <br />� ❑ Service ❑ <br />APPROVP.L� ❑ PARTIAL APPROVAL <br />� ❑ CORRECTION REQUIRED <br />❑ Corrections I�sted below MUST BE MADF before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />❑ CALL 259•8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE UF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />