Laserfiche WebLink
everett <br />e <br />INSPECTION REPORT <br />Addre; <br />Contre <br />Ownei <br />Date <br />TYPE OF INSPECTION REQUESTED <br />;� BLOG: PmL No. �� 1 MECH: Pmt. No. _ <br />Cl ELEC: PmL No. <br />❑ Temp. Elect. <br />❑ Footing <br />❑ Foundation <br />❑ Ductwork <br />O Wood Stove <br />tiC7 Masonry <br />I-I PLBG: Pmt. No. <br />❑ Framing ❑ Gas Piping <br />❑ Drywall, Nailing ❑ Consultation <br />❑ Shear Nailing ❑ Groundwork <br />❑ Grid ❑ Siruct. Slab <br />❑ Rough•In �Final ' <br />❑ Service <br />PPROVAL ❑ PARTIAL APPROVAL " <br />❑ VIOLATION ❑ CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE belore work ca� be approved. <br />❑ Please contactinspectorand arrangeforappointmen' <br />❑ Was not able to perform irspection. <br />❑ CALL 259•8010 FOR REINSPECTION — 24 hour notice required, <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />��)�l� liyloi�i�c�i_�� �TFQ�r�2 �„w�..i,tiitr�� <br />Inspector <br />Date � � �—� <br />