Laserfiche WebLink
INSPECTION REPORT <br />Lj I Address <br />bR,1Pl�rC s vner _2� i '4,4,•1.�"u1� <br />Cale <br />T'(PL JF INSPE''.JION REQUESTED <br />_ ❑ BLDG: Pmt. No. _ I I MECH: Pmt. No. <br />I 1 ELEC: Pmt. No. —L) PLBG: Pml. No. <br />Temp. Elect. ❑ Framing ❑ Gas Piping <br />❑ Footing ❑ Drywall, Nailing ❑ Consultation <br />❑ Founcation ❑ Shear Nailing ❑ Groundwork <br />O Ductwork ❑ Grid Strucl. S!ab <br />❑ Wood Stove ❑ Rough -In final <br />Cl Masonry ❑Service <br />fLYRPPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION I 1 CORRECTION REQUIRED <br />❑ Corrections lisled below MUST 13E MADE before work can be approved. <br />0 Please contact Inspector and arrange for appointment. <br />❑ Was not able to perform Inspection <br />❑ CALL 2rg-8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector! Dale <br />