Laserfiche WebLink
COMcheck Software Version 3.9.4 <br />Mechanical Compliance Certificate <br />2012 IECC <br />Section 1: Project Information <br />Project Type Alteration <br />ProjectTitle SUPERCUTS <br />Construction Site: Owner/Agent: <br />GREEN TREE PLAZA TX <br />305 SE EVERETT WAY SUITE 2 <br />EVERETT, WA 98208 <br />Section 2: General Information <br />Building Location (for weather data) Everett, Washington <br />Climate Zone: 4c <br />Section 3: Mechanical Systems List <br />Quantity System Type 8 Description <br />Designer/Contractor <br />KEVIN SANCIBRIAN <br />THE DIMENSION GROUP <br />10755 SANDHILL RD. <br />DALLAS, TX 75238 <br />214-343-9400 <br />HVAC System 1 (Smgte Zone) : <br />Heatingt each - Central Furnace. Gas, Capacity = 130 k8tulh <br />Proposed Efficiency = 80.00% Et, Required Efficiency = 80.00% Et <br />Cooling: 1 each - Single Package DX Unit, Capacity = 70 kBtulh, Air -Cooled Condenser, fur Economizer <br />Proposed Efficiency = 11.00 EER. Required Efficiency = 11.00 EER <br />Fan System: Unspecified <br />Water Heater 1: <br />Electric Storage Water Heater, Capacity: 80 gallons <br />Proposed Efficiency: 0.82 EF. Required Efficiency: 0.82 EF <br />Section 5: Compliance Statement <br />Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, <br />specifications and other Calculations submitted with this permit appliration. The proposed mechanical alteration project has been designed <br />to meet the 2012 IECC, Chapter 8, requirements in COMcheck Version 3.9.4 and to comply with the mandatory requirements in the <br />Requirements Checklist. /f <br />�%, r� cyFi�O•s�. <br />Name -Title <br />9glnmure Date <br />Section 6: Post Construction Compliance Statement <br />1.1 HVAC record drawings of the actual installation and performance data for each equipment provided to the owner within 90 days after <br />system acceptance. <br />O HVAC 08M documents for all mechanical equipment and system provided to the owner within 90 days after system acceptance. <br />Written HVAC balancing report provided to the owner. <br />The above post construction requirements have been completed. <br />Principal Mechanical Designer -Name Signature <br />Date <br />Project Title: SUPERCUTS Report date 03/20/15 / <br />Data filename: L.\Regis\14863 - SC #81482 (F) - Everett, WA\06 MEP1ComChecklscN81482 everett,wa cck Page 3 0l 3 (3vJ <br />