Laserfiche WebLink
.TO 8E COMPLETED BY �ppLICA�T <br />EV�LU.�T10N FOR <br />ACEVCY USE ON�y <br />c. Whac general types o! soils are found an the site (for e:cample, clay, sand, gravet, pent. � <br />muck)? If you know the classification of agricultural soils, ;pe:ity them and nute any prime � <br />farmland. Soi1s tests currenely underway. I <br />d. Arc there suriace indications or history of unstable soils in the immediate vicinity? IF so, <br />dacribc. <br />\o <br />a. De;::ribe ehe purpose, tyfe, and approximate quantit'es oi ans tilling ur 3rad�g pro- � <br />posed. Indicate iource of Fili. Ccading propu;rd — S�ome fill a[ wes� en � <br />of property (Suurce from east grading). , <br />(. Could erosion ar,ur as a result of cleari�� co�ser�ction. ur use'? If so. ge�erally describe. <br />Erosion could occur as a resu o c eanng, nowever, <br />proper erosien control during construccion should be . <br />easv co maintain. <br />g. About what percene of tha site wi11 be covered with imperviaus surfxca after projecc <br />conscructiar. (for ezample, asphalt or buildin )? <br />93%-94�, site covered wLch asphalc �nd building. <br />h. Proposed mezsu:a to reduce or can[rol erosion, or o�her impac�s to the earth, if anv: <br />Landscaping, on—site wa[er system tied into existing ci[y <br />syscem with concribucion into ci[y drainage fund. <br />3. Air <br />a. What typcs of emissions to the air wauld rault from the proposal (i.e., dust, aucomobile. <br />odors, industrial wood ;moke) during construetion and when �he project is completed? If <br />any, generally descritx and give approximate quancities if known. <br />OnLy che normal dust/odors during construction and • <br />obvious air emissions Erom autos being driven [a <br />[he Eacility. <br />b. Are there any off—site sourca of emissians or odor tha[ may affcct your proposal? If so, <br />generally ducribe. <br />Nonz <br />c. Proposed measura to reduce or contral emissions or o�her impacu to air, if any: <br />Nor.z . � <br />