Laserfiche WebLink
TJ BE COMPLETED BY �PPIIUNT <br />c. Is the site part oC a migration route'! If so, explain. <br />\u <br />d. Proposed measures to preserve or enhance wildlife, if any: <br />Vore <br />6. Enerey and Nab�nl R�courca <br />a. '�Vhai kinds of enrg� (electric, natural gas, oil, wood stove, solar} will be used to meet <br />the completed project's energy needs'? Describe whether it wilt be used for heating, manu- <br />facturing, ctc. <br />Eleccricicy Eor lighcing; heacing, tenant power needs <br />5. ��'ould vour project a(Fect the potential use of solar energy by adjacent propertia? If s., <br />genera:ly dacribe. <br />�o <br />c. Whac kinds o( energy conserva[ion featura are includcd in the plans of this propoul'! <br />List other proposcd measures to reduce or centrul energy impacu, if any: <br />No excra-ordinary Eeatures <br />7. Enriranmenul Halth <br />a. Are there any environmenul hcalth hazards, including ezposure to toxie chemica!s, risk <br />o( fire and ezplosian, spill, or ha7ardous waste, that could occur u a rault of this praposal? <br />If so, dacribc. <br />Vone <br />I) Dacribe special emergency servica that might be required. <br />�one <br />2) Proposed meaz4res to «duce or cantrol cnvironmental halth nazards, if any: <br />None <br />b. Nuix <br />1) What tyQes of noise exist in the area which may afkct your project (for exxmple: <br />traCfic, equipment, operation, other)? <br />None <br />2) What typa and levels of noise would be c.reated by or associated with the project on a <br />shan-term or a long-term basis (for example: traffic, construction, operation. other)? Indi- <br />cate what hours noise woelc come from the site. <br />Auc�mobile noises - normal busine�s hour operations <br />similar to those along Everetc Mall Way. <br />EVALUATIqN FOR <br />�GENCY USE ONLY <br />��.�,,�y ��,�„ <br />, d�a,c:r� �� <br />i�lv2�.- �� <br />I <br />I <br />