My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
312 SE EVERETT MALL WAY 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
312
>
312 SE EVERETT MALL WAY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2022 1:09:44 PM
Creation date
2/13/2017 8:19:07 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
312
Notes
AUTO MALL CAR WASH
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-TO BE COMPLETED BY APPLICANT <br />c. What general types of soils are found on the site (fur example, clay, sand, grave' peat, <br />muck)? If you know the classification of agricultural soils, specify them and note:In: prime <br />farmland. Soils tests currently underway. <br />d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, <br />describe. <br />\o <br />e. Describe the purpose, type, and approximate quantities of any tilling or gradi g pro- <br />posed. Indicate source of till. Grading proposed - Some fill at west en� <br />of property (Source from east grading). <br />f. Could erosion occur as a result of clean co str ction. or use'? If so. generally describe. <br />Erosion could occur as a result' of Clearing, However, <br />proper erosion control during construction should be <br />easy to maintain. <br />g. About what percent of the site will be covered with impervious surfaces after project <br />construction (for example, asphalt or buildinRS)1) <br />93%-94% site covered wLth asphalt and building. <br />h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: <br />Landscaping, on -site water system tied into existing city <br />system with contribution into city drainage fund. <br />=. Air <br />a. What types of emissions to the air would result from the proposal (i.e.. dust, automobile. <br />odors, industrial wood smoke) during construction and when the project is completed? If <br />any, generally describe and give approximate quantities if known. <br />Only the normal dust/odors during construction and <br />obvious air emissions from autos being driven to <br />the facility. <br />b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, <br />generally describe. <br />None <br />c. Proposed measures to reduce or control emissions or other impacts to air, if any: <br />None >u:zzr....d..c...:�..»zc. ._�.✓,.e, _W<.. .,F �. <br />EVALUATION FOR <br />AGENCY USE ONLY <br />
The URL can be used to link to this page
Your browser does not support the video tag.