Laserfiche WebLink
r0 BE COMPLETED BY ♦PPLICANT <br />c. Is the site part of a migration route? If so, explain. <br />No <br />d. Proposed measures to preserve or enhance wildlife, if any: <br />None <br />6. Energy and Natural Resources <br />a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet <br />the completed pr.iject's energy needs? Describe whether it will be used for heating, manu- <br />facturing, etc. <br />Electricity for lighting, heating, tenant power needs <br />b. Would your project affect the potential use of solar energy by adjacent properties? If so, <br />generally drscribe. <br />No <br />c. What kinds of energy conservation features are included in the plans of this proposal? <br />List other proposed measures t reduce or control energy impacts, if any: <br />No extra -ordinary features <br />7. Environmental Health <br />a. Are there any environmental health hazards, including exposure to toxic chemicals, risk <br />of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? <br />If so. describe. <br />None <br />I ) Describe special emergency services that might be required. <br />None <br />2) Proposed measures to reduce or control environmental health }wizards, if any: <br />None <br />b. Noise <br />1) What types of noise exist in the area which may affect your project (for example: <br />traffic, equipment, operation, other)? <br />None <br />2) What types and levels of noise would be created by or associated with the project on a <br />short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi- <br />cate what hours noise would come from the site. <br />Automobile noises - normal business hour operations <br />similar cc chose along Everett Mall Way. <br />EVALUATION FOf <br />AGENCY USE ONLt <br />7,ek-. <br />umdP�,�lo2r�vt d <br />Jx5e tGYt�7`G{Q <br />n{v'r^ <br />vV rVit <br />Sui F� SPI'll5 <br />re, <br />