Laserfiche WebLink
n <br />TO BE COMPLETED BY APPLICANT <br />g. Proposed measures to reduce or control transportation impacts, if any: <br />None other than develop 3rd street and providing Everett <br />Hall Way accesses and on —site parking (paving, sidewalks, <br />curbs and landscaping) <br />IS. Public Senices <br />a. Would the project result in an increased need for public services (for example: fire pro- <br />tection, police protection, health care. schools, other)? if so, generally describe. <br />Existing fire, police protection is adequate for proposed project. <br />b. Proposed measures to reduce or control direct impacts on public seri:ces, if any. <br />None <br />16. Utilities <br />a. Circle utilities currently available at the site: electricity, natural gas, water, refuse serv- <br />ic., telephone, sanitary sewer, septic system, other. <br />b. Describe the utilities that are proposed for the project, the utility providing the service, <br />and the general construction activities on the site or in the immediate vicinity which might <br />be needed. <br />Snohomish County PUn <br />General Telephone <br />C. SIGNATURE <br />The above answer's are true, and complete t wledge. I understand that <br />the lead agency is relying on them to a is eeis' <br />Signature: For Finley(Architects„ .... <br />g ...... " " Ito ert'P.�Lehman, Architect <br />Date Submitted: .......................................................... <br />1. <br />EVALUATION FOR <br />AGENCY USE ONLY <br />