My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
318 SE EVERETT MALL WAY 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
318
>
318 SE EVERETT MALL WAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2019 1:29:18 PM
Creation date
2/13/2017 8:20:10 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
318
Notes
PRECISION TRANSMISSION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC kURKS DEPARTMEi�" <br />, !tl'IL?Tti=� DIVISION �. <br />3200 CEDRR STREET <br />E�1�TT, WASHINGTON <br />COST ESTIMATE SHEET <br />Requested by xirk Brooks Date of Request e-26-86 <br />Charge Cost to (Name) <br />Address Zip <br />Fund Utility ACC Program W.O. M Assigned ,m� <br />Installation Location 37.8 S.E. Everett Mall Wav Auto Mall Assoc.) <br />Installation <br />and one hydrant installation. <br />Total Estimated Cost 54759.00 <br />Two 12°x6" hot taps, two final conne�tions, <br />This estimate =eflects the Utilities Division having to <br />provide labor, equipment and materials to complete the <br />above mentioned in�tallation including, but not limited <br />to, the ite�ns identified to the right. Any labor and/or <br />equipment provided by the contractor to facilitate the <br />work by the City water department will be reflected in <br />a refund to the person making the c�eposit. <br />Saw cut .............. <br />Shoring ..........., g <br />Excavation .......... g <br />Backfill ............ X <br />Compaction .......... X <br />Temporary Patch ...... g <br />Permanent Patch .... X <br />, Furnish double check val.ve assembly for <br />temporary water supply . ....... ... <br />Final hook-up after purity and <br />pressure testing ........... <br />(IYhenever the estimated cost is not sufficient to cover the total expense for labor, <br />material, equipment rental and administrative costs, the deficit shall be charged to <br />the property for which such installation was made and the owner thereof, and pr�vided <br />further, that ar.y �xcess payment shall be returned to the person applying fox the <br />installation.) <br />Itemized Cost Estiur,ate: <br />Labor F, Overhead 1688,0o Q,�, l�� 259-8821 <br />Mater.ial 2615,00 Estimate Prepared By o.D, wahl Phone N <br />Equipment Rental _3 6 00 <br />Surface Restoration l00.0o cc: Larry Callahan <br />T�TAL ESTIMATE 4759,00 Do 17 ' k <br />dl5 lvJ L+ � U l5 �� <br />lJ LI <br />AUG 27 1986 <br />......................................................._...._ <br />CITY OF EVERETi' <br />Pu�;!c Works Depi. <br />h�� ��aa��a�� <br />#� 8�( d�3 �'' <br />� <br />n eit amp <br />Larry Crawford <br />Bob Chervenell <br />Clair Olivers <br />
The URL can be used to link to this page
Your browser does not support the video tag.